Udvidet returret til d. 31. januar 2025

Multi Objective Optimal Reactive Power Planning in Power Systems - K. R. Vadivelu - Bog

Multi Objective Optimal Reactive Power Planning in Power Systemsaf K. R. Vadivelu
Bag om Multi Objective Optimal Reactive Power Planning in Power Systems

Reactive Power Planning (RPP) is one of the most complex problems of power systems.RPP utilizes the existing reactive power sources judiciously while planning suitable location and size of VAR compensation to be installed in a system to meet the requirements of future load increase to keep a reasonable voltage profile under normal condition and contingency states. RPP requires the simultaneous minimization of two objective functions. The first objective deals with the minimization of operation cost by reducing real power loss and improving the voltage profile. In this Book Fast Voltage Stability Index (FVSI) has been used to identify the weak buses for Reactive Power Planning. The outcome confirmed significant decrease in system losses and enhancement of voltage magnitude with the use of FVSI. The test and justification of the proposed algorithm are conducted on IEEE 30¿bus system and 72-bus Indian system. Recently RPO problem is formulated as Multi-Objective Optimization (MOO) problem.

Vis mere
  • Sprog:
  • Engelsk
  • ISBN:
  • 9786200254818
  • Indbinding:
  • Paperback
  • Sideantal:
  • 156
  • Udgivet:
  • 22. august 2019
  • Størrelse:
  • 150x10x220 mm.
  • Vægt:
  • 250 g.
  • 2-3 uger.
  • 14. december 2024
På lager

Normalpris

  • BLACK WEEK

Medlemspris

Prøv i 30 dage for 45 kr.
Herefter fra 79 kr./md. Ingen binding.

Beskrivelse af Multi Objective Optimal Reactive Power Planning in Power Systems

Reactive Power Planning (RPP) is one of the most complex problems of power systems.RPP utilizes the existing reactive power sources judiciously while planning suitable location and size of VAR compensation to be installed in a system to meet the requirements of future load increase to keep a reasonable voltage profile under normal condition and contingency states. RPP requires the simultaneous minimization of two objective functions. The first objective deals with the minimization of operation cost by reducing real power loss and improving the voltage profile. In this Book Fast Voltage Stability Index (FVSI) has been used to identify the weak buses for Reactive Power Planning. The outcome confirmed significant decrease in system losses and enhancement of voltage magnitude with the use of FVSI. The test and justification of the proposed algorithm are conducted on IEEE 30¿bus system and 72-bus Indian system. Recently RPO problem is formulated as Multi-Objective Optimization (MOO) problem.

Brugerbedømmelser af Multi Objective Optimal Reactive Power Planning in Power Systems



Find lignende bøger
Bogen Multi Objective Optimal Reactive Power Planning in Power Systems findes i følgende kategorier:

Gør som tusindvis af andre bogelskere

Tilmeld dig nyhedsbrevet og få gode tilbud og inspiration til din næste læsning.