Vi bøger
Levering: 1 - 2 hverdage
Forlænget returret til d. 31. januar 2025

Design Considerations for Space Elevator Tether Climbers - Cathy Swan - Bog

Bag om Design Considerations for Space Elevator Tether Climbers

The subject selected for this 2013 study is the Space Elevator Tether Climber. The objective of the one year study was to survey current concepts and technologies related to tether climbers, identify critical issues, questions, and concerns, assess their impact on the development of space elevators, and project towards the future. The following are a few of the conclusions: ¿ The study used the concept of "constant power" as a baseline because of its ability to lower design requirements on the tether climber. ¿ The mass breakout of 6 MT for a climber and 14 MT for customer payloads seems feasible. The estimate is that with a travel time of one week to GEO seven tether climbers can be on a tether simultaneously. ¿ The communication architecture should be integrated into the space elevator infrastructure and nodal layout. ¿ Solar power, as the sole source, appears achievable. ¿ The use of laser power as the sole source also seems achievable.

Vis mere
  • Sprog:
  • Engelsk
  • ISBN:
  • 9781312099821
  • Indbinding:
  • Paperback
  • Sideantal:
  • 92
  • Udgivet:
  • 20. april 2014
  • Størrelse:
  • 209x279x13 mm.
  • Vægt:
  • 270 g.
Leveringstid: 2-3 uger
Forventet levering: 17. januar 2025
Forlænget returret til d. 31. januar 2025
  •  

    Kan ikke leveres inden jul.
    Køb nu og print et gavebevis

Beskrivelse af Design Considerations for Space Elevator Tether Climbers

The subject selected for this 2013 study is the Space Elevator Tether Climber. The objective of the one year study was to survey current concepts and technologies related to tether climbers, identify critical issues, questions, and concerns, assess their impact on the development of space elevators, and project towards the future. The following are a few of the conclusions:
¿ The study used the concept of "constant power" as a baseline because of its ability to lower design requirements on the tether climber.
¿ The mass breakout of 6 MT for a climber and 14 MT for customer payloads seems feasible. The estimate is that with a travel time of one week to GEO seven tether climbers can be on a tether simultaneously.
¿ The communication architecture should be integrated into the space elevator infrastructure and nodal layout.
¿ Solar power, as the sole source, appears achievable.
¿ The use of laser power as the sole source also seems achievable.

Brugerbedømmelser af Design Considerations for Space Elevator Tether Climbers



Find lignende bøger
Bogen Design Considerations for Space Elevator Tether Climbers findes i følgende kategorier:

Gør som tusindvis af andre bogelskere

Tilmeld dig nyhedsbrevet og få gode tilbud og inspiration til din næste læsning.