Vi bøger
Levering: 1 - 2 hverdage

Construction Scheduling, Cost Optimization and Management - Hojjat Adeli - Bog

Bag om Construction Scheduling, Cost Optimization and Management

This book provides a practical methodology which will be of great benefit to all those involved in construction scheduling and cost optimization.

Vis mere
  • Sprog:
  • Engelsk
  • ISBN:
  • 9780367863807
  • Indbinding:
  • Paperback
  • Sideantal:
  • 338
  • Udgivet:
  • 12. december 2019
  • Størrelse:
  • 309x667x21 mm.
  • Vægt:
  • 530 g.
  • 2-3 uger.
  • 4. februar 2025

Normalpris

Medlemspris

Prøv i 30 dage for 45 kr.
Herefter fra 79 kr./md. Ingen binding.

Beskrivelse af Construction Scheduling, Cost Optimization and Management

This book provides a practical methodology which will be of great benefit to all those involved in construction scheduling and cost optimization.

Brugerbedømmelser af Construction Scheduling, Cost Optimization and Management



Find lignende bøger
Bogen Construction Scheduling, Cost Optimization and Management findes i følgende kategorier:

Gør som tusindvis af andre bogelskere

Tilmeld dig nyhedsbrevet og få gode tilbud og inspiration til din næste læsning.