Udvidet returret til d. 31. januar 2025

Post-Project Monitoring of BMP's/SUDS to Determine Performance and Whole-Life Costs - L. K. Lampe - Bog

Bag om Post-Project Monitoring of BMP's/SUDS to Determine Performance and Whole-Life Costs

The project is being conducted in two phases. Phase 1, which is the subject of this report, includes a literature review and a survey of stormwater authorities and organizations in the U.S. and U.K. to identify the most commonly used BMPs and SUDS and to determine the availability of data on their cost and performance.

Vis mere
  • Sprog:
  • Engelsk
  • ISBN:
  • 9781843397168
  • Indbinding:
  • Paperback
  • Sideantal:
  • 302
  • Udgivet:
  • 30. juni 2004
  • Størrelse:
  • 156x234x18 mm.
  • 2-4 uger.
  • 19. december 2024

Normalpris

  • BLACK WEEK

Medlemspris

Prøv i 30 dage for 45 kr.
Herefter fra 79 kr./md. Ingen binding.

Beskrivelse af Post-Project Monitoring of BMP's/SUDS to Determine Performance and Whole-Life Costs

The project is being conducted in two phases. Phase 1, which is the subject of this report, includes a literature review and a survey of stormwater authorities and organizations in the U.S. and U.K. to identify the most commonly used BMPs and SUDS and to determine the availability of data on their cost and performance.

Brugerbedømmelser af Post-Project Monitoring of BMP's/SUDS to Determine Performance and Whole-Life Costs



Find lignende bøger
Bogen Post-Project Monitoring of BMP's/SUDS to Determine Performance and Whole-Life Costs findes i følgende kategorier:

Gør som tusindvis af andre bogelskere

Tilmeld dig nyhedsbrevet og få gode tilbud og inspiration til din næste læsning.