Udvidet returret til d. 31. januar 2025

Disposal of Surplus Plutonium at the Waste Isolation Pilot Plant: Interim Report - National Academies Of Sciences Engineeri - Bog

Bag om Disposal of Surplus Plutonium at the Waste Isolation Pilot Plant: Interim Report

Disposal of Surplus Plutonium at the Waste Isolation Pilot Plant: Interim Report evaluates the general viability of the U.S. Department of Energy's National Nuclear Security Administration's (DOE-NNSA's) conceptual plans for disposing of 34 metric tons (MT) of surplus plutonium in the Waste Isolation Pilot Plant (WIPP), a deep geologic repository near Carlsbad, New Mexico. This report evaluates DOE-NNSA's plans to ship, receive, and emplace surplus plutonium in WIPP and its understanding of the impacts of these plans on WIPP and WIPP-bound waste streams. This report, the first of two to be issued during this study, provides a preliminary assessment of the general viability of DOE-NNSA's conceptual plans, focusing on some of the barriers to their implementation.

Vis mere
  • Sprog:
  • Engelsk
  • ISBN:
  • 9780309485005
  • Indbinding:
  • Paperback
  • Sideantal:
  • 66
  • Udgivet:
  • 30. december 2018
  • Størrelse:
  • 213x8x277 mm.
  • Vægt:
  • 204 g.
  • 2-4 uger.
  • 27. november 2024
På lager

Normalpris

  • BLACK NOVEMBER

Medlemspris

Prøv i 30 dage for 45 kr.
Herefter fra 79 kr./md. Ingen binding.

Beskrivelse af Disposal of Surplus Plutonium at the Waste Isolation Pilot Plant: Interim Report

Disposal of Surplus Plutonium at the Waste Isolation Pilot Plant: Interim Report evaluates the general viability of the U.S. Department of Energy's National Nuclear Security Administration's (DOE-NNSA's) conceptual plans for disposing of 34 metric tons (MT) of surplus plutonium in the Waste Isolation Pilot Plant (WIPP), a deep geologic repository near Carlsbad, New Mexico. This report evaluates DOE-NNSA's plans to ship, receive, and emplace surplus plutonium in WIPP and its understanding of the impacts of these plans on WIPP and WIPP-bound waste streams. This report, the first of two to be issued during this study, provides a preliminary assessment of the general viability of DOE-NNSA's conceptual plans, focusing on some of the barriers to their implementation.

Brugerbedømmelser af Disposal of Surplus Plutonium at the Waste Isolation Pilot Plant: Interim Report



Find lignende bøger

Gør som tusindvis af andre bogelskere

Tilmeld dig nyhedsbrevet og få gode tilbud og inspiration til din næste læsning.